
Deep utility excavation
Controlled excavation and material handling in a constrained developed area.

Commercial & Residential
CDC Excavation supports underground utility construction with safe, organized trenching, bedding, installation support, backfill, and compaction. Work is coordinated around plans, existing utilities, inspections, access, and the other crews sharing the site.

Scope
Every estimate is built around the plans, field conditions, access, schedule, and responsibilities specific to the project.



Project types
Equipment & technical capability
Our process
Plans, utility locates, access, traffic needs, inspections, and testing responsibilities are clarified before excavation.
The trench is excavated and bedding prepared according to the specified alignment, depth, and site conditions.
Pipe and structures are placed with required coordination for inspections, connections, and testing.
Backfill and compaction are completed in sequence, followed by grading and the agreed site restoration.
Recent work

Controlled excavation and material handling in a constrained developed area.

Coordinated loading and movement of excavated material for continued site production.

Excavation and truck access maintained during cold-weather site conditions.
Insurance certificates and project-specific documentation can be provided with the proposal when requested.
Licensing, permits, inspections, testing, and certifications are confirmed by scope and jurisdiction before contract.
Fort Wayne, Indiana and surrounding areas within an approximately two-hour radius.
Frequently asked questions
Both public and private scopes can be evaluated. Requirements vary by owner, municipality, plan, and permit, so licensing, inspection, and testing responsibilities are confirmed before contract.
Responsibilities are defined during estimating. Required locating, traffic control, inspection, and testing must be coordinated before work proceeds.
Testing and disinfection responsibilities depend on the project requirements and contract scope. CDC will identify included and excluded responsibilities in the proposal.
Scopes may include stormwater, sanitary sewer, and water systems, along with trenching, bedding, backfill, compaction, and related structures.
Request a bid
Tell us what you are building and attach the documents we need to understand the site and scope.